According to communicate by telephone and now the team is CNT8552_Phase6 to nodeB to integrate waste occurred. WMPT cards do not can integrate nodeB. The way the team performed to remove UMPT from nodeB. CNT8507_Phase8 sites because it is the same team. Used instead of the site CNT8552 then integrate nodeB and the service damage occurred on UMPT card and make the site go through field have access to make changes to the site, CNT8552 is a portal on WMPT instead to make service. Therefore, the conclusion is as follows: 1. I had to remove the site CNT8552 to provide WMPT brothers made claim warranty. 2. I will interfere with the way brother sends me to UMPT via cards, I'll claim I'm doing with the system itself, because it still hasn't been able to CNT8507 A70 lol. Sorry if this causes confusion and I reiterate it is a matter of mix between phase not again lol. Thanks dude
การแปล กรุณารอสักครู่..
