Study results showed that the Kasetsart University campus, sriracha. With peak electrical consumption last year stood at 2.5 MW/year 2556 (2013) will have to pay for electricity at 34.5 billion per year, but when changing from 22 MW 115 MW power system is to pay for the electricity is about 32.7 million per year, an appropriate transformer is loaded all is equal to 17 MVA 115 kV consists. Expense in civil structures and electrical equipment hire as well as money, all 37 million. Have a payback period of the project is that 10 years.