The result of the forecast quantity of cargo on the route. It was found that when the construction of the rail line, range road junction is the way Gil RA-Ubon Ratchathani pair will result in a demand for transport goods through a horizontal path. The project increased by product category, as most of the agricultural products processing, such as rice, sugar, cassava processing, including items in the cement group in 2009 to 2569 will be shipping in the path. Estimated tons/year and 941,800 increase 1,275,300 tons/year-on-year since 2584 and approximately 1,553,200 tons per year in the year since the rate of increase is 2598 approximately 1.8 per cent per year. For example, the quantity of the item on the train between stations (Line Load Max.) of the route is located between Station Road and Gil RA-junction train station (direction from road junction to buri RAM JI RA), in quantity, on the train between 2569 channels maximum value of about 2280 tonnes/day-and increased-3882 tons/day in the year 2598 (as shown in table 3.2.3.2-1) by the horizontal transport routes, most (about 90%) would be goods such as agricultural products processing types RA, rice tapioca, sugar processing, and the rest is oil product category. Cement and other items.
การแปล กรุณารอสักครู่..