The contractor has a store system to control the delivery, which is a system that is likely to control mistakes, and TPCC also arranges spare parts and equipment one by one to make control and inspection easier, but it is found that there is no TPCC's signature on the invoice.
การแปล กรุณารอสักครู่..
