By the wave guide "is a concrete pillar structure is only 50 cm triangle, which is the placement of a 3 row by the depth of the concrete pillar Chase from the beach to find the Earth is 10 m and 6 m, 8 m, respectively.Placing each pole is placed 1.5 meters apart and put the pole between rows 1, 2, and 3 are placed in the teeth, fish.When the blow came in waves. The wave will be reflected into two side slash and to reflect on the columns placed are considered as "the strength of the waves. When the waves came through a horizontal structure. The waves are broken down. Make floating sludge in takonboriwen coastal waterfall behind the mass concept of dams.Structure of part 2 is to help to prevent silt mast has a concrete image, Boomerang. Off to the side behind a wall to prevent the northeast monsoon wind blown back out to sea along the takonboriwen again. It not only helps to reduce coastal erosion only. But it can also take the same sediment, blowing away.This structure has a role in the catchment, sedimentation, soil and sludge are one accumulate shallow. The research team will apply beginning dare to grow to help anchor the soil, bangkhuntien, this section, as the Earth sprouts back again, despite how interesting. And use is sufficiently productive here, but it is something that we need to recognize that นื่คือการ solve the problem at the end result, we know that because global warming and sea rise due to melting polar ice water into the ocean is more time, we need to help stop the crisis of global warming.
การแปล กรุณารอสักครู่..
