Project study Study on improving methods of work, to reduce the time it takes factories to produce drinking water. Is intended to analyze the reasons for the delay in the working and storage tanks for drinking water, clean work. And establish standards in the production of drinking water from water tank isolation procedures to clear water tank packed drinking water to CAP's scene. Steps to perform studies consist of (1) a preliminary understanding of the factory (2) Propose solutions and improvements (3) data analysis and comparison of operating results before-after adjustment (4) summary of results. From these data, researchers have taken the hypothesis generation tools to improve by applying 5W 1H. Solution for ECRS
The result of the complete study. Study on improving methods of work, to reduce the time it takes factories to produce drinking water, found that after adjusting the tank area from the customer, learn to pour wash tanks,Steps to clear drinking water tanks, drinking water filling procedure and steps to close the lid and CAP's scene. Make time to work on steps to lower tank wash drops 818.6 85.9% of the second distance decreased 31.4 meters accounted for 88.2% of the working time in the process of drinking water tanks, washing time is reduced 34.2% accounted for 27.6 seconds, a distance of 6 m decrease in 53.09% working time in the process of filling the tank of drinking water decreased 161.9% accounted for 72.5 seconds a distance of 48 metre decline accounted for 78.6% of work time on CAP's scene fell 15.6% 44.8 seconds, taking the distance as former
.
การแปล กรุณารอสักครู่..