The worker cooperative projects were studied in Nonthaburi Thailand co., Ltd. branch postal companies. Generally, I found the problem is when there is a lot of quantity to be guilty in the separate slopes of goods due to limited storage space. Those who study education concepts and theories to improve performance. By. Think about ways to improve techniques in the ECRS by using the S option is to make it easier to control with Visual Control and visibility by the screening Board khopkraba ware. Can help reduce errors and a reduction in extraction. The original 1 minute time is 30 seconds or, decrease to 50% and reduced errors from 5 times 2 times accounted for 60%.
การแปล กรุณารอสักครู่..