The goal of purchasing power in each area of Phase 1 include the area in the Metropolitan Electricity Authority (MEA). A total of 200 MW and the Provincial Electricity Authority (PEA) of 400 MW, divided into North 5 MW. , East 98 MW, 159 MW and west Central 138 MW.
การแปล กรุณารอสักครู่..
