The coating Teflon1. Step cleaning and preparing the surface before coating Teflon1.1 steam fire moisture and oil residue with the workpiece.By the piece, 400 incubator temperature c. For 40 minutes.The workpiece to remove 1.2 warm dry clean skin prep before coating TeflonBy spraying with sand type sizes of sand, small and very detailed.2. Step coating Teflon2.1 the workpiece through the surface preparation, and the spraying Teflon (Teflon) quality standards.By using the spray gun with good quality so that the pigment pretty fair and square.2.2 the workpiece through spraying Teflon. The steam so that the substance of Teflon Island work best.By the piece, 380-400 incubator temperature c. For 90 minutes.3. Quality inspection procedure of Teflon3.1 quality inspection of the Teflon coating of the workpiece.By monitoring the thickness and the uniformity of the Teflon in spraying.According to the standard that the customer specifications.
การแปล กรุณารอสักครู่..