Review Model of the quarry is calculated and designed to transport mined limestone for the year, according to the quantity and quality, as required by the power plant is required to forward to the Mine's Operation to be used in the control of the contractor, and monitoring the disposal of soil cement quarry, including defining the details of the limestone quarry ponds each year, such as position, horizontal water Sump Street. The forward mine. Parking locations where the pond treatments Where a bomb so that it is in the scope of the planned quantity of limestone a year and according to the contract with the contractor.
การแปล กรุณารอสักครู่..
