(2) units of flood protection dike
cars flood the dike. The details and layout done various forms depending on the height of the level of protection and the condition of the soil. The ability to support the weight of the soil. And the area around the construction Which must be considered in the description of each area. However, whether in the form of flood protection in the country is relatively high compared to the cost of construction vehicles to flood the soil, but it takes much less space in the building. Therefore, the construction of flood protection units in this format suitable for use in case of limited space or land prices remain high.
การแปล กรุณารอสักครู่..
