From the original plan, about a day to deliver jobs for tomorrow. Not possible because there were changes in the length of the piping spool and must be cut and weld. With NDE and Hydro test g-ngahen that should have been sent to the next boat trip.Help with consideration.
การแปล กรุณารอสักครู่..
