Step 2
wiring from original power domain size 2x2.5SQM. To face the bathroom
process. 3
installation breakers before the bathroom. The wiring to the breakers before wiring into the water in the toilet. To prevent short circuit
.Step 4
wired to the machine. According to the handbook supplied with water heater
step 5
valve water welding line into the water off for the original shower water heater
.Some brands have a shower set assembly. To choose from, both new and old
process. 6
experiment open check leak locating, and the heat of the water out.
การแปล กรุณารอสักครู่..