Performance Test will have to be able to Reuse the water NET 1000 m3/day or 50 m3/h of the system performance according to the attachment design based on real-world engineering testing only.
Performance Test to be net Water Reuse 1000 cubic meters / day, or 50 cubic meters / hour of performance of the attachment assembly designed according to the real test by the engineers only.
Performance Test must have water net, Reuse 1 000 m3 / day or 50 m3 / h. Of the performance of the system attached document for reference from the test designed by fieldwork based on animal engineering.