According to company's Disaster Recovery test plan ITMX (DR) 2559) to prepare and support the emergency scenarios with plans to test the following: 1st September 16 between 15-2559 The range is 1.
According to the company's plans ITMX tested Disaster Recovery (DR)) for the year 2559 in order to prepare and support emergency situations. The test plan follows
the first period between 15-16 September 2559 at the first.
According to the ITMX plan test Disaster Recovery (DR) annual 2559 to prepare and งรับส situation of emergency. The test plan is as follows.The 1 during the 15-16 September 2559.The 1.