-To design and write a device installed a pumping system inside the ship with Solid works 3D, Auto cad, 2D-3D.-Complete the HVAC air conditioning inside the boat with Solid works 3D, Auto cad, 2D-3D.-Do the Piping Spool Part assembly work.-Closed system design of air and ventilation in engine room on ship.-Write a wall cabinet is the brochure to order ships fold.-Floor plans and device inside the ship with Solid works 3D, Auto cad, 2D-3D.-Design Part, various accessories inside the ship with Solid Works 3D.-Write the electrical system on board.-Write to system task check box in the boat.-Write the piping in the ship.-Documenting the progress of the work with the head of the note.-Document File related tasks design drawings, global-Contact between departments and the concerned parties.
การแปล กรุณารอสักครู่..
