This research is to study and improve production in the welding point of the workpiece STAY, EXHAUST MAIMFOLD to optimize the production process. The robots are deployed to help in the production. Studies and data collection process in the current climate problems around time for production than the target production time. It must have been working overtime for employees. Resulting in a cost increase of employee overtime. In order to be able to keep up production to meet the goals of the customer. There is also the risk of accidents at work of employees. To solve such problems, it was to analyze ways to solve problems. Found that the introduction of robotics to assist in production can reduce the production time down to 21.63 seconds per piece, representing 42.73 percent were in manufacturing increased by 53.06 per hour, or about 74.61 percent by the break. The investment of the project is two years and to increase revenue in manufacturing production over the next eight years up to 1,129,895.19 baht or 28.28%.
การแปล กรุณารอสักครู่..
