6. The period walking stick electrical, water, Sanitation, and fire and the vertical Shaft 7 story deck, install toilet floor 3-7, 3-wire hundred-7, and all the blue mule, install lights electric light, scripting, plug floor 1 - 2,Testing the water, Sanitation, and fire all of the Material is a separate value for the amount of 2,243,897 Baht inclusive of value added tax, and labor costs for the amount of 629,053 Baht as well as value added tax
การแปล กรุณารอสักครู่..
![](//thimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)