The process of waekkham Air and moisture-absorbent, should follow the following steps:1. detection of leaks and make any repairs done successfully, remove the nitrogen tank out.2. turn the valve to the Low valve on the High section closed.3. gently rotate your way counterclockwise to Low nitrogen gas released through Wire Gauge and a way out of the Compound Gauge.4. remove the vacuum pump to come here through the vacuum line connected to the Gauge.5. rotate the valve, Gauge, Compound path.6. a waekkham absorb air and humidity for at least 45 minutes.7. watch the Gauge lower than 0 Compound into a Vacuum is to scale down to 29 inches of mercury.8. when a valve is closed about 15 minutes the Vacuum gauge through Low and High cooling and substance that is added to, and then open the valve through its Low gauge, cooling substance system until the gauge pointer walked psig.9. close the valve via Low Vacuum gauges and instruments of both anyway make a Vacuum again until the time of not less than 45 minutes, and the needle of the gauge pointer under 29 inches of mercury.10. during the Vacuum to remove the large 100 Watt to make heat e waep Corporation remove headers inhibitor and gas heating with condenser for steam, humidity or fine particles that exist within the system and machine is becoming an. Vacuum suction;11. when the Vacuum about 45 minutes walk and the needle of the gauge via Low point lower than 29 inches of mercury, close the valve of the Low way gauges.12. prepare stuffing following cooling compounds
การแปล กรุณารอสักครู่..