Install power plug 4 position, 4 points, A Line installed at the side of the scale, the side Cabinet, the sides of the SCLP OPS Cyclone Main SCLP and Cutter. The outbound side of the Line E
Install power plug 4 position, the Line A mounted by four points scales, lateral cabinet OPS Cyclone of SCLP, Side Main Cutter SCLP and Line E on the outbound side.