Chop 6.3.1. supervisor must be checked by pulling the water flows so that the premium on the nozzle out the frequency to check once a week, chop.Supervisor (inspectors) should take note of the information from the inspection and sign the form on time – check that the machine or nearby and keep a copy of the middle section.
การแปล กรุณารอสักครู่..
![](//thimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)