The purpose of this study was to study the process of production planning and scheduling, production problems and solutions to optimize production and delivery capacity to meet the needs of customers as well as to shorten the time. Planning decisions faster. A major problem, however, is planning to use the experience as a principal. There is no tool in the decision It takes a lot of planning to cause trouble for shipping delays. Students have to know the rules, priorities, using indicators and process sequence tactic analysis (Analysis Hierarchy Process: AHP) analysis, which analysis is Shortest Processing Time (SPT) to assist in planning with. Microsoft Access application development can cover the operation and management database to assist in the planning and production scheduling. You can optimize planning and minimize delivery delays. From planning and scheduling production system was compared with the results of the tests, after developing a program to find effective planning can be increased, reducing planning time down to 32.63%, or decreased 67.37% to reduce the number of delivery. delays 25% and can reduce manufacturing costs 93,341 baht / year.
การแปล กรุณารอสักครู่..