This project as a case study the working process of employees the packing drinking water. In order to make the time used in the production of drinking water and drinking water packing down shop lotus D Co., Ltd., in the packing drinking water to break out, A subB packing drinking water C bottle opener D cylinder lift down
.E check with labeling F move wait for delivery. Then the timer in the performance to compare the performance with the original method and ways of improving performance.The improved. Change head pay new water that are larger than the original. The lid and arrange to make it easy to pick up the use of The time from the practice by the traditional method 78.55 sec / tank. When improving new work 68.10 seconds / tank
.
การแปล กรุณารอสักครู่..
