Authorized (MRTA) off traffic in the area, both 8 points. Construction of metro route to embark as separate ratchayothin still between the confirm from Bangkok.Whether to use any guidelines in the management, which is no more than 2 months are concluded.
การแปล กรุณารอสักครู่..
