I send files to the latest revision of the Building Turbine Building Neo civil
let you check the details. And other components if it is ok to reply to us as soon as possible to give a Neo civil
bid
for me if the building Turbine Building of the latest revision of the Neo civil, do not fix anything. Or a little more
, I want to take a number
- Foundation & Equipment 1st Floor El + 200 (Dwg.NO B-Th-435-3,410 Sh2_B)
- Foundation & Equipment 2nd Floor 4:25 El + (B-Dwg.NO. th-435-3411 Sh2_B)
- Foundation & Equipment 2nd Floor El + 6:25 (Dwg.NO B-Th-from 435 to 3412. Sh2_B)
in the form of Neo civil that I sent. Or
, you can send a file Drawing DWG. (B-Th-435-3410 Sh2_B, B-Th-435-3411 Sh2_B, B-Th-435-3412. Sh2_B
I can give you, because we left Design Equipment of 1st Floor El + 200 include Diesel Generator Foundation,
Compressed Air Foundation, Feed Water Pump Foundation, and I request information for designing Foundation , I hope to get a reply. Your back soon
การแปล กรุณารอสักครู่..
