The process of casting work. After preparing the soil for water, food, or other necessities before casting cast piece should check for mold. Clean the mold before casting the pieces with vinegar using a sponge dampened mat wipe inside of the mold. To rub your SOAP (Soap Potassium) that came with the mold, then water the soil so that soil sedimentation water fall into the water the soil type between the Tana, the piece is defective or damaged. Use flour to sprinkle the molds, and then use the brush will allow a mold Assembly and installation pieces, rubber or rope used to tie a neat, tight so that no water pressure in clay molds. Check for mould before casting the matter completely. Then pour the water into the soil, water, dirt, mold flow. Then wait for the soil to absorb water, mold, and a timer to determine the thickness of some of. If the water in the soil to replenish the water body into the soil to make a piece of work is the same thickness or until the ground water will not be a full body print and by casting the casting formwork tons. And the hollow, as appropriate, of the individual pieces. Casting pieces, making it ngankluang the weight of the ornaments, the more reduction by soil water lubrication method suits the job details and sophisticated, so have the format of a standard thickness appropriate for implementation. When the thickness of the soil and water from the mold, the mold upside down until there is no water in the soil flows out. Then turn over the mold and wait until that is inside the mould can be removed from the till.
การแปล กรุณารอสักครู่..
