In a separate study traffic engineering and transportation. Consultants have conducted studies to predict the traffic volume of the Expressway, outer ring - the intersection Route 4 (Tho) by year, the future seven-year goals include fiscal 2559, 2564, 2569, 2574, 2579, 2584 and 2589. including consultants have studied the PCU-KM / day and the PCU-HR / day by year goals. With the above Sustainable Expressway, outer ring - the intersection Route 4 (Pak) with a length of approximately 75 kilometers of power line routes will be constructed along the island, Rama 2, and the areas are two provinces: Samut Sakhon. And province So the origin to important travel routes used during the transit through the Samut Sakhon and Samut Songkhram. In addition, the origin of two major travel Province also has to travel from the province in the south.
การแปล กรุณารอสักครู่..