After the construction of the structure near the roof started to prepare an external action. Site Drainage, including the Base Grade, Sub, Sub Road Footpath & RC.
After completion of construction of structures close to the roof began to prepare external action , including Site Drainage, Sub Base, Sub Grade, RC. Road & Footpath.