School district labor d
in support of projects R2C assembly with 3 work as follows:
1. Interface Data between system HIS with SAP
status. Now, during a fall details, between HIS Middleware SAP
(meeting Friday 17 เมษษยน 2558)
2.Improve the HIS to support the project. R2C by demand, collect team are as follows. Registration Process
a I. Insurance. Policy Validation (real time)
II. Membership / Coupon (MC) validation
III. Corporate program validation (Mobile Checkup)
IV.? Real Time
v. Employee / Doctor welfare
B. Cashier Process
I. Payor plan simulation
II.Selfpay
III. Popup message
C. Deposit Process
I. Cashier receive Deposit by HIS system generate Deposit, Doc
II. Interface. This transaction to ERP by posting to GL - Deposit account (not preauthorized deposit)
III. Offset billing amount and print. Receipt document
IV. F, Cash Deposit return full remaining deposit amount print Return, Deposit doc
v.Generate Exception report if Deposit Balance < > 0 or Retained amount
vi. Case: BHN transfer EN to BMC with billed amount. (Cancel Request)
VII. BHN request Patient transfer to BMC through work flow attached w EN Detail (Cancel Request)
VIII.? Refund drug / med supply to return inventory and generate CN
D. Treasury Process
.Status during the conclusion needs that each HIS need improvement program, in part, and in the case of HIS cannot support. We have the support, however, because if the t HIS cannot support BPX needs.Development of a new program to support or not, because, if there is a new program development. HIS team must have a data storage requirements. Add the time development
.3. Cleansing Data
status during the data collection by now, there are 1 preparation, is a grouping of Sub Category. Order Item
4. Report status, there is no requirement specification
.From the status, function, found that the current state will be between the data description to the system design plan, but from the main project. R2C are Go live Phase 1 in October 2558 which from time to time, such, the team developed a system of HIS.On improving the system for 3 months and test system 1 months which team to assess the working current, and found that if you are not conclusive. Requirement of it. That need that need it, we have to have a response.However, because each guideline development team will be working guidelines system. Different
.Therefore, the team wanted to involved various help. In conclusion, on the approach to support various needs to clear, so that the development team's system. HIS will proceed system development in the next step!
การแปล กรุณารอสักครู่..