His Majesty the King has gave the initiative when February 19, b.e., irrigation Department 2532 feasibility study of the project water storage dam PA SAK River urgently to solve the. A shortage of water for farmland and the beneficial relief and flood problems that occur regularly in the PA SAK basin is the sequel came to Bangkok and perimeter zone with which bring hot month, almost every year. B.e. 2536 December 4, when his Majesty the King has gave the word, since in the 25th on the development of water sources, irrigation Department that began during the current, it could solve the problem of flooding. Drought and shortage of water to the public. Will require construction of the dam, 2 of the PA SAK River and Nakhon nayok River, which the Cabinet approved the action. When this project take May 3, b.e. 2537 construction of 5 years between b.e. 2537-2542, and his Majesty deign signed. Dam: "PA SAK jolasid dam" means "the PA SAK River at the dam catchment effectively." PA SAK jolasid dam catchment has started for the first time when June 15, b.e. 2541, where his Majesty the King and the King's most excellent Majesty were of Royal as Chief.
การแปล กรุณารอสักครู่..
