The results of operations and project activities: The construction of the dam was completed. Of fully has the ceremony start retaining water. When November 26 2551 (2008) The success of the project: -Flood relief aid, especially in the river basin area, the lower the. Approximately 75,000 acres in the WAT bot district, amphur Muang, Amphoe bang krathum district, Phitsanulok and Wang thong. -Support for irrigation area water sources as the left hand side and the right side of the little river. Approximately 155,000 acres and the area cultivated in the dry season irrigation project, approximately 250,000 acres of Chao Phraya. -Sideline projects have used water district for the consumer. Approximately 47.3 million cubic meters per year. -Strengthen the profession from the output of fish in reservoirs is to make money, people around the reservoir and both sides of the river. -As a source of recreation and tourism in Phitsanulok province and nearby.
การแปล กรุณารอสักครู่..