On December 26 the 2558 last day of work before the long stop and check Inventory includes checking gas Argon Co2 + quantities from the authorization.The quantity of CO2 = 70 = 115 CUM CUM, Argon, which is in a quantity that exceeds the minimum value defined is 50, but during a long CUM stop we do not turn off the Main valve because.To move the Assembly parts and then for 4, which is the date the first date, job production, has been notified by the S/V that CO 2 from CO 2 quantities found check = 0 = 50 CUM CUM, Argon. Need to pipeline to stop.Wait for the additional CO2, from 06.00-12.30.
การแปล กรุณารอสักครู่..
