1. verification and recording of waste daily.2. the summary and the report sent to PE and Production.3.PE and Production meetings, find out why and correct the problem.4. follow-up was.5. report on the results of the edit in report and Monthly.6. the report.
การแปล กรุณารอสักครู่..