Because the range from April 59 onwards, in the range of Renovate is blocking area can be used to load only 1 channel channel. Which is the channels used for loading goods. And transport boxes for use in packing, therefore the fur box up Stock to provide sufficient use. Production, in which the said. Box for packing goods will be placed at the Anteroom advance 1 days for the application, along with unfavorable environments. May make box with moisture than usual. Due to the strength of the box usually has a reduced load 2 channel channel. The planning preparation packing box for wait inside day of the packing.A Peak in delivery, make the staff fatigue. And some of the new employee, no skills in the arrangement of goods loading. It may make during the loading boxes arranged not tight. Not according to the level of a row loads. It is likely that the box at the end safety tilt and fall.The size of the box may not be appropriate. But the audit found that the size of the box is not changed. A box the same size with loads of safety TCGC # 001: 16 (800 g.), which found no problem box collapse. Also, after filling the gaps left in the box, only 5 mm. Only, which is unlikely to result in any such problems.
การแปล กรุณารอสักครู่..