After pouring cement, sand smooth and polished it leveling 24 hours, 3 days left to mature at all, dry and free of moisture, not less than 15 days, and then begin the hard wood flooring.
After leveling cement, sand it smooth and polished 24 hours after incubation for 3 days left to dry. And not less than 15 days without moisture, thus starting the flooring.
After the cement sand leveling polished smooth and 24 hours. The curing throughout the 3 days. ทิ้งไว้ให้แห้งสนิท and without moisture is less than 15 days. Then start the wood flooring