Consultants and construction supervision of MRT blue line extension CSCBL golf range, Chai-thapra Consortium (2.57 kilometres distance) between April 4 to June 5 1890 2554 2559 total contract value 10,163,343,224.84 day time baht (excluding value added tax). The project features detailed design and construction of underground tunnel consists of • a twin tunnel. Length approximately 2.57 km • construction underground station 2 station is the terminal station, the stadium is the most freedom • ventilation • the vent connection to the construction contract, the airport is the most brilliant wen 1. This contract inherited from 1 contract at Pak Klong Sanam Chai ran through the market, and the Chao Phraya River through the side of the road-cut kalayanamitra temple area of freedom has been elevated into sittha RAM connected to a separate contract 4 tha Phra.