Results of monitoring the volume of drilling operations in the pit L53-G survey found that in General, sound standards set by the national environment Board, vol. 15 (2540 (1997)) assigned to no more than 70 and 115. DB (a) respectively, so as to confirm that activities during the drilling hole production volume will not generally exceed the standard value.
การแปล กรุณารอสักครู่..