2nd floor.1. dismantle the iron window channels.2. dismantle the output window3. install the aluminium window4. installation of frosted whole class.5. install the lighting system6. paint the entire floor with frosted
I 2.1. Dismantled steel window.2. Through a window?3. The installation of aluminum windows4. Install the ceiling and floor.5. Installation of lighting system6 painted the ceiling. I"m ready.