1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 contractors company to choose the operation at least 1 people supervisor
3.3. The training content in the control plan the performance and detailed MSDS of chemicals to the employees by the Department of security company
3.4 practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.5 various electrical equipment used to test condition. The sticker passed state from maintenance. And allow the use 3
.6 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
work HT MASTIC
3.7 wear equipment PPE with predetermined standards (WI-SR-001)
3.8 supervisor to check the placement of PLATFORM with ANCHOR installation must be placed in a mess. Have a walk, not in my way 3.9
. Install cushion pad on ANCHOR to prevent his
3.10 install adequate ventilation, every job performance in order to reduce the amount of vapor and wearing protective masks ice volatile compounds. Constantly working
3.11 label warning. "Combustible." the bucket HT MASTIC and should not be set to sunlight or heat
3.12. After work done every time to clean up the area to clean all the time. Storage equipment and order
3.13 provide scaffolding ladder or safe in the HT MASTIC on high
3.14 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.The lining CF and install insulation sheet
3.15 wear PPE device with standard setting (WI-SR-001)
3.16 supervisor to check the layout. PLATFORM with ANCHOR installation must be placed in order. There is a walk, not in my way
3.17 installed on the ANCHOR pads to prevent his
3.18. Perimeter work with BLUE SHEET or canvas. To prevent the spread of CF scrap and sheet insulation
3.19 after work every finished cleaning area to clean all the time. Storage equipment and order
3.20 provide scaffolding ladder or safe in the lining CF on high
3.21 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
3.22 supervisors need to install partition or surround the practice with a cloth to prevent BLUE SHEET Fei (waste of CF decentralized and wear dust mask
3.23 trimming CF or sheet insulation pad to install waste. And store left a mess
3.24. After work done every time to clean up the area to clean all the time. Storage equipment and order
3.25 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.