The impact assessment carried out the project rain water runoff. In the area there are paths to improve the road to L53-G production base into a hole by the entrance road is a road in lateritic Crusher 2 channel. Width approx. 6 m have approximately 1 percent slope and will adjust the reclamation area, the highest flood level in the area. By the entrance road was designed and built according to the standard of the Pan Orient.