In October, แดือน power supply Department, 2556 (2013) has detected a power transmission system protection devices 69 kV relay protection. The error that occurred, it would have made the claim, with Siemens and. 2556 (2013), along with a check for the annual maintenance of the power supply station to the Metropolitan electricity authority. Currently in the system testing period band Sha
การแปล กรุณารอสักครู่..