The installation of pipes, water ppr class 3/60 1.5 degrees / 0.5 inch
Installation of sewer 2/3 inch
and 4-inch pipes installed flush toilet
drilling the 4th and 5th floors. To install sewer lines and sewer pipes, septic installation work to stop the pipeline.
การแปล กรุณารอสักครู่..