Survey and detailed design for construction of a landfill to produce electricity. (The feasibility study of the project) to supply areas that are possible and appropriate for the establishment of a landfill to produce electricity. At least three areas of potential areas of waste to produce energy that can be considered. The development of knowledge in the field of processing solid waste into energy. And has performed as a model. For the local government area To improve solid waste management in there. Current lifecycle from origin to destination, with greater efficiency. By considering the most out of every step. In particular, solid waste, organic waste. Are biodegradable in nature. Garbage and plastic waste which is disposed of without difficulty. Will be recycled for use in the production of renewable energy. This will delay the construction of power from fossil fuels to the other one. Thus reducing greenhouse gas emissions, a major cause of global warming.
การแปล กรุณารอสักครู่..
