3.1.3 After pouring the cement floor polishing and leveling sand, 24 hours a day, throughout the three days to mature, dry and free of moisture, then began to carpet.
3.1.3 after leveling cement sand polished floor 24 hours throughout the day to the curing 3, leave it to dry and free of moisture. Then embark on carpet.