11 Jun 2014 date mentioned power plants Off line work comp 2 Nong khae GTG wash 11 and 10 days with a Base load tests of GTG11, so I can compare the performance of GTG before and after the trend is better?
Said to date 11 Jun 2014 Graduates 2 for Power Plant Off line comp wash GTG 11 and 10 have tested the operation of GTG11 Base load so I can compare data. GTG performance before and after improvement or not.
Mention the date 11 Jun plant 2014 Nong khae 2 do Off line comp wash GTG 11 and date 10 test machine, Base load walk. Of GTG11 it would compare the efficiency of GTG data before and after the trend better?