1.3.1 steps system development. The following• Collect and issue to onset• Wakhro and screen design and related reports.• Development and testing of the system.
1.3.1 Development in accordance with the following • Collect and want the issue on the accounting system •. The ship's design and discussed the FR and reports that are relevant to •. Development and testing
According to an 1.3.1 system developed at the following- collection of problems and wanted to have กบั system.- long open time analysis and design as well as thick screen and report about the.Develop and test the system.