To ease concerns of worried people living within the area and nearby areas. A survey in this project will use that reference from the long-term safety study of the vibration of the petroleum survey by measuring seismic waves. The wave generator size for 2-3 kg for size 1.5 kg birth to wave the company will take the stage of the project, the standard reference period of The United States Bureau of mine: USBM, 1971 Description: this survey of project phases, as shown in table 1-10, the project must be based on strictly operating throughout the survey.
การแปล กรุณารอสักครู่..